Skip to main content
Strong Asset Tags
Menu
Construction + heavy equipment

How Apex Build Manager survived a five-year fleet audit

How Apex Build Manager survived a five-year fleet audit

The challenge

A construction fleet of more than 800 pieces of equipment had been tagged with thin polyester labels that wore off within 18 months. Audits took two weeks and missed assets.

The solution

Migration to Strongest-tier 10-mil plastic tags with 3M 467 adhesive and 5-mil overlaminate, sequentially numbered with the existing fleet ID scheme. Tags placed on the operator-station access panel.

The result

Five years later, zero tag replacements. Annual audit time dropped from two weeks to four days. Lost-asset rate dropped 40 percent in the first year.

Field-tested for five years. We have not replaced one tag.
Apex Build Manager

Stop replacing labels. Start trusting them.

Send us a photo of where the tag has to live. We ship free samples in the format and size you'd use. No setup fees, low minimums, no obligation.